Westbury estate

334 new homes will be built in three phases. 38 new homes will be for current council tenants and 77 new homes for people on the council’s housing list, with a minimum of 153 new affordable overall.

Status: 
In delivery
Area: 
Clapham
Initiative: 
Homes

Designed by award-winning architects Metropolitan Workshop, in close consultation with local residents, the plans for Westbury estate introduce two new, safe routes through the estate, better connecting it to the surrounding area and Heathbrook Park. There will be more usable green space within the estate, and buildings will be in keeping with the handsome local architecture. All homes will be modern with practical storage and low running costs.

St James will deliver phase one, with 64 new homes at council-level rent being built on two sites on Wandsworth Road. Planning permission has been granted and work is due to start in summer 2018, so existing residents will have new homes to move into in 2020, before Phase 2 begins.

The main estate redevelopment takes place in Phase 2, with some low-rise buildings being replaced and the landscaping revitalised. Outline planning permission has been granted for 270 new homes, of which 89 will be affordable, incorporating 46 at council-level rent. The work will start late on in 2020 and homes will be delivered in stages from 2022 onwards.

Location

The Westbury estate is located on Wandsworth Road near Wandsworth Road station.
SW8 3LE

Get in touch

For more information
Contact
Estate Regeneration Team