Better and fairer Lambeth directory

Displaying 21 - 30 of 35
  • Oasis Academy Johanna Feasibility Assessment

    • Vauxhall and Waterloo
    A study of the redevelopment potential of Oasis Academy Johanna primary school.
    Status: In development
  • Open Digital Planning (formerly RIPA and BOPS)

    • Lambeth wide
    Lambeth were proud to be the hosts for the launch of the new Open Digital Planning (ODP) project which combines the previously named RIPA (Reducing Invalid Planning Applications) and BOPS (Back Office Planning System) in December 2022 at the Royal Festival Hall. ODP is a collaborative project aimed at making it quicker and easier to make and process planning applications. Lambeth is a pioneer council at the vanguard of the Digital Planning revolution. We have been collaboratively leading this project since 2019.
    Status: In delivery
  • Our Streets: Streatham South – Improvements to the junction at Kempshott and Buckleigh Roads

    • Lambeth wide
    We're making improvements at the junction Kempshott Road and Buckleigh Road to make the road safer for pedestrians.
    Status: In delivery
  • Resilient communities: communities that are thriving and connected

    • Lambeth wide
    Stronger relationships and a vibrant community sector, alongside economic growth, will enable communities to thrive.
    Status: In delivery
  • Rush Common Woodland Walk

    • Brixton
    We're making improvements to Rush Common Woodland Walk in Brixton to provide those who live nearby with an outdoor space that is more welcoming and suitable for all ages.
    Status: In delivery
  • Sandell Street pedestrian upgrade

    • Vauxhall and Waterloo
    We are working with Transport for London to improve the pedestrian experience on Sandell Street.
    Status: In development
  • South Bank Public Realm Protection

    • Vauxhall and Waterloo
    We have installed counter terrorist security barriers at key points to create a safety zone around the South Bank to protect pedestrians by preventing an attack using a vehicle as a weapon.
    Status: Completed
  • Streatham Common Playground and Kiosk

    • Streatham
    This project revitalised the playground with timber play equipment, connected pathways, seating area and is designed for toddlers through to more challenging pieces for older children.
    Status: Completed
  • Streatham Hill low traffic neighbourhood - temporary scheme

    • Streatham
    Temporary traffic barriers stop through traffic, making it easier to walk, cycle and keep up social distancing.
    Status: In delivery
  • Tackling serious youth violence

    • Lambeth wide
    We're reducing youth violence through a community-led, public health approach focused on preventing future generations from being affected by violence in Lambeth.
    Status: In delivery